Retained Reciepts - Clackamas River Side Channel Project

(Stewardship Contract)

Description: 

This project was the first project implemented by the Clackamas Stewardship Partners utilizing retained reciepts from past commercial thinning contracts. 

 

The goal of the project was to re-connect a side channel located at mile post (MP) 35 of highway 224 to the mainstem Clackamas River.  The side channel is a natural channel approximately 1,275 feet long that was filled with spoils during road construction.

 

 

 

 

 

AttachmentSize
Vicinity Map.pdf403.01 KB