2007 Clackamas Restoration Projects
(Planning Document)
Posted December 3rd, 2007 by Bob Bergamini
Description:
The 2007 Clackamas Restoration Projects EA includes restoration activities that will be included in Stewardship contracts generated by the 2007 Plantation Thinning Project.
Restoration activities included in the EA include the following projects:
- Instream and side channel projects
- Fish passage
- Road Repair
- Road Decommissioning
- Road Closures
- Unauthorized Vehicle Damage
| Attachment | Size |
|---|---|
| EA2007_clackamas_restoration.pdf | 252.12 KB |