Project #003 - Road Decommissioning
This Stewardship project requires services for the Contractor to decommission four roads (0.78 miles). Decommissioning involves removal of aggregate, excavation of culverts, stream channel restoration, decompaction of road surfaces, cross-ditching (drainage structures), outsloping, seeding, fertilizing & mulching exposed soils, disposing of excavated culverts, and blocking vehicular access with a series of berms or barriers.
ROADS TO BE DECOMMISSIONED:
| Road Number |
RoadProject road is attached to |
Surface Type | Length |
Miles aggregate to remove |
Estimated number of culverts |
Estimated closure structures at start of road |
| 4620-011 | 4620-130 | pit run | 0.14 | 0.13 | 0 | 2 |
| 4620-013 | 4620 | aggregate | 0.23 | 0 | 0 | 2 |
| 4620-016 | 4620 | native | 0.14 | 0 | 0 | 2 |
| 4620-018 | 4620-180 | pit run | 0.11 | 0.11 | 0 | 2 |